Project Overview

Project Objective

To deliver a purpose-built, durable, and accessible Provincial Education Office building in Chinsali that centralises administrative functions, improves staff productivity, and provides an inclusive space for stakeholder engagement. Executed by Trymate Zambia, the facility will support improved education governance and service delivery across the province by providing appropriate office, meeting and support spaces finished to minimise maintenance and optimise operational efficiency.

Scope of Work

The works cover substructure, superstructure, finishes, MEP installations and associated external works. Key elements are described below.

1. Construction of the Office Block (Building Works)

Sub-structure (to slab level)

  • Excavation and formation of strip and pad foundations per geotechnical recommendations.

  • Blinding, reinforcement and concrete works up to slab level for office block, toilets, kitchen and entrance foyer.

  • Damp-proof membrane and termite protection where required.

Super-structure

  • Erection of reinforced concrete columns, beams and ring beams.

  • Blockwork/brick infill for columned walls and partition walls where specified.

  • Installation of reinforced concrete lintels over openings.

Structural Roof Members and Covering

  • Fabrication/installation of structural roof members (trusses/rafters) sized to structural design.

  • IBR roof sheeting with appropriate flashings and rainwater disposal.

Metal Works (Doors & Window Frames)

  • Supply and installation of metal door and window frames, including security grills where required.

  • Provision for timber/metal doors in offices and service areas as specified.

Carpentry Works

  • Timber works for floor decking and ceiling linings.

  • Supply and installation of internal doors, shelving, reception counter and joinery.

Plastering, Flooring and Finishes

  • Internal and external plastering.

  • Floor finishes using 1:4 cement:sand screeds with final finish (tiles or polished screed as specified).

  • Painting to internal and external walls, door frames and grills.

Plumbing, HVAC and Electrical Installations

  • Complete plumbing including water supply, sanitary fittings and drainage.

  • HVAC provision as per specification.

  • Electrical wiring, distribution boards, lighting, power outlets and provision for data/telecoms.

Accessibility, Staircases & Safety

  • Staircases and ramps to meet accessibility requirements.

  • Accessible toilets and signage.

  • Basic fire safety provisions in line with regulations.

2. External Works

Site Preparation

  • Site clearing, grading and earthworks to ensure proper drainage.

Concrete Works & Pavements

  • Vehicle access, parking bays, concrete walkways and paved areas.

Perimeter Wall & Gates

  • Secure perimeter wall/fence and vehicle/pedestrian gate with security provisions.

Water Reticulation & Septic Systems

  • External water reticulation connections and construction of septic tank and soakaways where sewer connection is not available.

Landscaping

  • Planting of trees and shrubs, turfing of lawn areas, and minor irrigation provisions.

Utility Connections & External Services

  • Connection to municipal electrical network or alternative supply and external lighting, gullies and manholes.

Expected Outcomes

  • A functional, professionally finished Provincial Education Office providing office space, meeting rooms, reception and support areas.

  • Improved administrative efficiency and enhanced capacity for provincial education coordination.

  • Inclusive access for persons with disabilities and secure premises for staff and visitors.

  • Durable building fabric and external infrastructure minimizing lifecycle costs.

Quality, Compliance & Sustainability

  • All works executed by Trymate Zambia to comply with relevant Zambian building codes and Ministry of Education guidelines.

  • Use of durable materials and workmanship to minimise maintenance.

  • Incorporation of passive design measures (natural ventilation and daylighting) and water-saving plumbing fixtures where feasible.

Conclusion

Executed by Trymate Zambia, the Construction of the Provincial Education Office in Chinsali District is a strategic investment in education administration infrastructure. On completion the office will provide a modern, safe and accessible environment that supports provincial education management and community engagement, contributing to improved service delivery across the region.